Thursday, October 27, 2011

the ice rink set

here is my ice rink set which i'm working on.

ice rink still covered up with tan paper here


my set isn't this dark, and you hope you can see the plexi glass that i'm using for my ice rink here.

my set with the light set up for this shot




this is a short shot i did last week when we had two earthquakes in sf and reworked it again this week. it's only 1 second long so don't blink :) i was working with the flying rig back there that you can see but it got stuck so i went ahead and used the surface gauge.

Friday, October 14, 2011

the locker room set

i have two sets for my thesis film, an ice rink were the majority of the animation takes place and a smaller set, the locker room.

my friend mei mei, who does stop motion animation and also works on making props and sets has been coming in to work and help me with this set. she's great, watch her work and you'll see.















Wednesday, October 12, 2011

my messy workspace

it's been awhile since i've posted anything. here is a quickie, my peeps. i'm currently going over one of my shot breakdowns and working on a x-sheet for one of my scenes that i'll be animating. yes, that's right i'm finally going to be working on the animation of my film. as you can see in the picture with all my stuff, my puppet is standing next to her replacement heads :)


my messy workspace